Updated on December 20, 2024 12:29:50 PM
The problem of hazardous waste is one of the main concerns in the state of Maharashtra, which is famous for its versatile industrialization process and processes of urbanization. The state houses all kinds of industries from chemical production to electronics, most of which produce dangerous waste. This waste if not disposed of in a proper manner can have adverse effects on the health of the people and the environment hence the need for proper regulation in its handling, treatment and disposal. The legal regime relating to authorization of hazardous waste management in Maharashtra is provided through several main rules encompassing the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 executed by the Maharashtra Pollution Control Board MPCB. Any company falling under the hazardous waste production, storage, or disposal category needs permission from the MPCB while proving that their operations conform to the measures put in place by the government in the bid to control pollution. Specific documentation which is obligatory for the application is waste analysis reports, site plans, as well as the detailed waste management plan. This body is extremely useful when it comes to the issue of compliance, approval and even enforcement of environmental standards. Coordinating with other authorities, the MPCB oversees compliance with the national and international level standard to eliminate the hazardous waste management, known to threaten the environment and health of the citizens.
Hazardous waste management can be defined as the systems used in identification, collection, transport, processing, recycling and disposal of waste products that may be injurious to the health of humans and other living organisms, as well as the surrounding environment. These materials which are categorized to be hazardous may be in solid, liquid or gaseous state and usually contain poisonous, acidic or alkaline, inflammable or explosive and reactive chemicals. But good management must be undertaken so as to avoid any negative interaction with the compound and pollution of the environment.
Planning entails the identification and categorisation of the hazardous waste, after that comes the collection and storage of the waste. This step is critical to prevent types and amounts which are more hazardous from being generated in the first place and thus avoid more unusual and serious types of environmental pollution. Different types of wastes require different methods of treatment; however, they normally comprise chemical, biological, or thermal processes that seek to remove menacing compounds. On some occasions, hazardous waste can be reclaimed or find another use thus they do not require disposal.
Disposal is the last one, normally in a secure landfill that has been constructed to avoid any escape of wastes and possible pollution of the environment. Legalities that aim at providing a proper way of dealing with hazardous wastes are strictly enacted with both regional, national, and even international policies being in place.
The benefits of Hazardous Waste Management Authorization include:
To obtain Hazardous Waste Management Authorization (HWA) in India, the following procedure must be followed, as outlined in the Hazardous Waste (Management and Transboundary Movement) Rules, 2016.
Complete the Form I, which involves crucial data about the person applying for the license, the type and amount of hazardous waste produced, and the plan for the disposal of the waste.
The application must be submitted accompanied by the fee once a person wants to commence commercial production.
Gather all the required documents for the procedure
The application will be observed and examined by the pollution control authority to determine compliance to the hazardous waste management.
If the application meets all the requirements, the HWA will be issued which is normally for a period not exceeding five years from the date of issue.
Renewal applications can only be filed 120 days to the date by which the existing authorization is set to expire. That same process is also used when renewal of either a single or multiple licenses is needed.
These documents are required to be submitted for the assessment of the applicant’s capability of managing, treating, storing and disposing hazardous wastes effectively by the State Pollution Control Board (SPCB) or Pollution Control Committee (PCC). The list of the main documents obligatory for hazardous waste management in India is briefly outlined below:
Particulars | Fees for Authorization (5 years) |
---|---|
All industry generation, managing, handling, storing, treating, disposing of Hazardous Waste | ₹10,000/- |
Professional Fees | ₹50,000/- |
Total | ₹60,000/- |
The validity of hazardous waste management authorization is 5 years. renewal of the authorization, An application for renewal of authorization should be filed one hundred and twenty days before the expiration of the existing authorization.The validity of hazardous waste management authorization is 5 years. renewal of the authorization, An application for renewal of authorization should be filed one hundred and twenty days before the expiration of the existing authorization.
The management of hazardous waste is central because of the many industrialists observed in this state. The process includes acquiring the permit from the MPCB under the Hazardous and other wastes rules 2016. Personal documents, site documents, waste analysis reports and plans have to be furnished along with the application. The fee for authorization is ₹60,000 this includes both the application fees and the professional fees with a validity of five years. Hazard waste management ensures that hazardous wastes do not pollute nature thereby maintaining the quality of air as well as controlling greenhouse gasses, improves health of the public and ensures sustainable business practices. Renewal applications should therefore be made 120 days to the date of expiry of the existing authorisation.
At Professional Utilities, we leverage our industry knowledge and expertise to help businesses navigate complex regulations, minimize risks, and optimize operations for maximum efficiency and profitability.
Hazardous Waste MMaharashtra industry shares a large portion of its waste in chemical industries and electronics industries as hazardous waste. To avoid polluting the environment, maintaining people’s well-being, and following the law, proper management is required.
On the procedures to get the approval of the MPCB, the steps include, filing of form I, application accompanied by the appropriate fee, documents that are crucial, verification, formal inspection, and getting an authorization number which takes, on an average, five years.
Yes, it is an important factor that subcategories of hazardous waste may have some peculiarities in management and treatment regulations. Thus, the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, elaborate on the further subgroups of hazardous waste.
Authorization is granted to one particular party and venue. In order to transfer it to another entity or another location, consent from the MPCB is needed and depends on whether one applies for a new capacity or a modification of the existing one. .